2-24 Chapter 2
GSE Scale Systems
Figure 2-15: Inserting Load Cell Wires
9. Insert the lead in place, as shown in Figure 2-16 for a 460 Series
indicator or Figure 2-17 for a 560 Series or 660 Series controller.
10. Test all connections by pulling lightly on each conductor.
11. Connect the load cell shield to the lever connector SHIELD.
12. Pull any excess cable back out of the controller through the strain
relief until there is no slack between the shield connection and the
strain relief.
13. Tighten down the strain relief securely to ensure a firm grip on the
cable.
Figure 2-16: 460 Series Load Cell Connections
Figure 2-17: 660 Series Load Cell Connections