Ceiling Requirements; Wall Requirements - GE Discovery NM/CT 670 Instructions Manual

Nuclear medicine imaging system
Table of Contents

Advertisement

Equipment Description and General Construction Requirements

2.3.2 Ceiling Requirements

Scan room height must be at least 2.5 meters (8' 2.5").

2.3.3 Wall Requirements

Operator room window
If there is an operator room, the operator must be able to view the patient from the operator
room during a scan. The location of the window depends on the position of operator room relative
to the scan room. It is recommended that the window is positioned in front of the console so that
the operator can look down the length of the bore, as illustrated in
Layout,
p.2-17.
The recommended patient viewing window dimensions are approximately 120 cm wide by 110 cm
high (48"×42").
Consult a qualified radiological health physicist for radiation protection requirements for the window
glass (lead content and thickness), in accordance with
Requirements, p.3-1
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
and with local requirements.
2-42
2.3 Room Structural Requirements
2.3.2 Ceiling Requirements
Figure 2-10: Minimal Room
Radiation Protection and Shielding

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents