Electrical Requirements
Table 5-6: D670 Customer Supplied Cables and Wiring
Wiring
Quantity
Size AWG
2
(mm
)
Run No. 1 – from primary power source to MDP
3
*
1
1/0 (50)
Run No. 2 – from MDP to PDU * (see
3
*
1
1/0 (50)
1
*
Run No. 3 – from MDP to System Emergency Off (SEO) (see
2
14 (2)
1
14 (2)
Run No. 4 – CT PDU to warning light control (see
2
14 (2)
Run No. 5 – CT PDU to scan room door interlock (see
2
14 (2)
*
Refer to
Table 5-3, D670 Minimum Feeder Wire Size, p.5-4
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
Description
*
(see
Figure 5-5,
Power
Ground
Figure 5-5,
p.5-17)
Power
Ground
Neutral (not required)
Power
Ground
Figure 5-6,
Warning light 24 volt control A3J2-1,2,3,4
Figure 5-6,
Scan room door interlock A3J6-1,2
for AWG (mm2) wire sizes
5.6 Typical Customer Supplied Cables and Wiring
5.6.1 Power Input Distribution Box (PIDB) with MDP (A1)
Maximum run length
Meter (ft.)
From
p.5-17)
1 (3)
1 (3)
1 (3)
1 (3)
1 (3)
Figure 5-5,
p.5-17)
2 (6)
2 (6)
p.5-18)
N/A
p.5-18)
N/A
5-16
To
1 (3)
1 (3)
1 (3)
1 (3)
1 (3)
2 (6)
2 (6)
N/A
N/A