GE Discovery NM/CT 670 Instructions Manual page 118

Nuclear medicine imaging system
Table of Contents

Advertisement

Electrical Requirements
Table 5-5: D670 Sub-system Inter-connection Cables(Continued)
Start / Destination
From
To
Console
Injector
(adaptor box)
ECG
CT gantry
NM gantry
CT gantry
NM gantry
CT gantry
NM gantry
CT gantry
NM gantry
Patient table
NM gantry
PIDB
MDP
PIDB
NM gantry
NM host
NM gantry
NM host
*
Actual length is the entire cable length, connector to connector, including cable run inside each sub-system.
Usable Length is the portion of the cable routed externally between sub-systems.
The MDP can be the A1 or other primary power disconnect device
The standard table cable provided is 20 M. There is an optional 10 M cable available.
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
H/V
Run
(Usable Length)
Separation
#
(Y or N)
Feet
Y
8.2
N
30
N
126
29.5
N
124
29.5
N
125
29.5
N
130
65.6 (62.3)
Y
120
65.6 (54.1)
Y
9
N
128
65.6 (54.1)
N
127
65.6 (54.1)
Actual Length
*
Meters
2.5
Power cable injector to console
9.1
Gantry to ECG monitor
9
CT table interface cable
9
NM-CT gantry interface cable
9
ECG and respiratory gating cable
20 (19)
Table cable harness
20 (16.5)
NM mains cable
2.5
PIDB-to-MDP power feed
20 (16.5)
NM gantry to Host Ethernet cable
20 (16.5)
NM gantry to Host persistence cable
5-13
5.5 System Cable Information
Description

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents