GE Discovery NM/CT 670 Instructions Manual page 130

Nuclear medicine imaging system
Table of Contents

Advertisement

Customer Checklist
Table A-3: Room Preparation (Continued)
Description
Structural and floor
preparation
Ducts
Electricity requirements
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
Floor tolerates specified loads
Floor meets thickness requirements or alternate
anchoring has been specified and is available from
the customer's structural engineer
Floor meets leveling requirements
Floor meets flatness requirements
Floor meets vibration requirements
Ducts installed in floor, according to approved room
layout
Ducts meet requirements (size, depth, sealing, high
voltage separation)
Three-phase Main Distribution Panel (MDP (A1))
meets requirements and is installed
Three-phase power line meets requirements, and
neutral has been pulled.
Wall outlets are live and available for installation
and service tools
Status See
A-4
Comments

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents