GE Discovery NM/CT 670 Instructions Manual page 51

Nuclear medicine imaging system
Table of Contents

Advertisement

Equipment Description and General Construction Requirements
Air
flow
Side view
14.2
(360)
Rear view
Figure 2-6:D670 CT Power Distribution Unit (PDU)
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
Air
flow
I/O connections panel
Air flow vents
(convection)
AC power
input box
Minimum air flow clearance
Front
Top view
Rear (service side)
Minimum air flow clearance
27.6
(700)
2-8
2.1 Equipment and System Components
Front view
AC power
input box
Seismic mounting
brackets (4 holes)
Note:
Dimensions are in
inches (millimeters)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents