Installation; Site Requirements; Transport; Unpacking - GE Typhoon 9200 Operating Instructions Manual

Table of Contents

Advertisement

3 Installation

This chapter provides information regarding installation of the Typhoon system.
For detailed information on installation, see Typhoon Installation Instructions.

3.1 Site requirements

Parameter
Power supply
Ambient temperature
Placement
Humidity

3.2 Transport

If you need to move the instrument, contact Technical Support. See back cover for
contact information.

3.3 Unpacking

Typhoon Operating Instructions 28-9623-56 AA
CAUTION
Heavy object. The Typhoon instrument weighs approximately 160 kg.
The instrument should be moved only by authorized Technical Support
representatives using the proper lifting equipment.
Check the equipment for any apparent damage before starting installation.
Document any damage carefully and contact your GE Healthcare representative.
Site requirements 3.1
Requirement
100-240 V AC, 50/60Hz
15°C to 30°C
Stable laboratory bench
10% to 80%, non-condensing
Installation 3
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Typhoon 9210Typhoon 9400Typhoon 9410Typhoon trio

Table of Contents