Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Illustration 3-10: Cable Curvature
NOTE:
In case of on grade cabling, because of the minimum curvature constraint of 150 mm
(6"), the cable will have to come from the side between Innova LC Positioner and patient
table.
3.3.6 Seismic areas
Chiller: The seismic kit for Lytron is included with the chiller when shipped.
In Seismic areas all cabinets must be anchored to the floor. See
System Compatibility
Every sub–system is delivered on site with its proper seismic kit.
•
Monitor Flat Panel Seismic Kit: 2353317
•
VCIM seismic kit: 2365510.
Anti–seismic means be installed before opening the system for normal use.
Refer to
Chapter 9, Section 2, Calculations
3.4 Ceiling
Aluminum rails support the In–Room Monitor bridge used in Innova system X–ray rooms.
Reference:
74
for referential documents. C1 & C2 Cabinets: Wall support 2285242.
Direction 5160944-13-1EN, Revision 2
Chapter 2, Section 3, Basic Innova
for Seismic Anchoring Information.
3 Structural Requirements