Power Line Outlets For Service - GE Discovery NM/CT 670 Instructions Manual

Nuclear medicine imaging system
Table of Contents

Advertisement

Electrical Requirements

5.8 Power Line Outlets for Service

It is recommended to install at least two standard power outlets in the scan room and in the
operator room, to be used for electrically powered service tools. The exact location of these outlets
should be defined according to regulatory and service clearances around the system.
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare
5-20
5.8 Power Line Outlets for Service

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents