GE Healthcare

3.3.6 Seismic areas

Chiller: The seismic kit for both Coolix 4000 is included with the chiller when shipped.
In Seismic areas all cabinets must be anchored to the floor. See
Compatibility
2285242.
Every sub–system is delivered on site with its proper seismic kit.
Monitor Flat Panel Seismic Kit: 2353317
VCIM seismic kit: 2365510.
Anti–seismic means be installed before opening the system for normal use.

3.4 Ceiling

3.4.1 LP4 rails

The required ceiling rail height for the LP4 is 2845 mm +/–5 mm (9 ft. 4 in +/–0.2 in). The rails must
be mounted so that the distance from isocenter to the wall where the park position is designated
is an absolute minimum of 3050 mm (10 ft. 1 in). The recommended distance is equal to 4.275 m
(14 ft). This includes the 150 mm (6 in) clearance between the end of the rails and the wall.
SeeIllustration 3-11 andIllustration 3-12
face toward isocenter.
NOTE:
Do not attempt to install the LP4 at any height other than 2845 mm (9 ft. 4 in) without
first contacting your General Electric Medical Systems representative.
The ceiling suspension rails must be parallel to each other. The distance between the center of
the rail mounting holes must be 97.8 –0 +0.2 cm. (38–1/2, –0 +1/16, in). The rails must be level to
3 mm (1/8 in) over the entire length of the rail.
NOTE:
It is the responsibility of the Hospital's Contractor to properly install the LP4 Stationary
rails per the room drawings.
74
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
for referential documents. Frontal C1, Lateral C1 & C2 Cabinets: Wall support
Potential Wall Interferences. Also, the lips on the rails must
Direction 5177951-4-1EN, Revision 1
Chapter 2, System
3 Structural Requirements