ABB REL650 Applications Manual page 204

Line distance protection relion 650 series
Hide thumbs Also See for REL650:
Table of Contents

Advertisement

Section 7
Current protection
198
have instantaneous function. The overcurrent protection of IED A1 must have a delayed
function. The sequence of events during the fault can be described using a time axis, see
figure 95.
A1
51
t=0
t=t
1
The fault
Protection
occurs
B1 trips
ANSI10000279 V1 EN
Figure 95:
Sequence of events during fault
where:
t=0 is when the fault occurs.
t=t1 is when the trip signal from the overcurrent protection at IED B1 is sent to the
circuit breaker. The operation time of this protection is
t1, t=t2 is when the circuit breaker at IED B1 opens. The circuit breaker opening time
is t2 - t1.
t=t3 is when the overcurrent protection at IED A1 resets. The protection resetting
time is t3 - t2.
To ensure that the overcurrent protection at IED A1, is selective to the overcurrent
protection at IED B1, the minimum time difference must be larger than the time t
are uncertainties in the values of protection operation time, breaker opening time and
protection resetting time. Therefore a safety margin has to be included. With normal
values the needed time difference can be calculated according to equation 110.
D ³
+
+
t
40
ms
100
ms
EQUATION1266 V1 EN
where it is considered that:
B1
51
t=t
t=t
2
Breaker at
Protection
B1 opens
A1 resets
+
=
40
ms
40
ms
220
ms
1MRK 506 334-UUS A
Feeder
Time axis
3
ANSI10000279-1-en.vsd
Application manual
. There
3
(Equation 115)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents