Chapter 1: Before You Install; Before Going To Site; Preparing Required Equipment; Equipment Required For Installation - Avaya G450 Installing And Upgrading

Hide thumbs Also See for G450:
Table of Contents

Advertisement

Chapter 1: Before you install

Read this chapter carefully before you begin the installation. If you are installing the G450 at a
customer site, read this chapter before going to the customer site.

Before going to site

Before going to the site, it is necessary to read the planning documentation and prepare

equipment required for installation.

Preparing required equipment

Make sure you have the necessary equipment to assist you in the installation before you start
working.
Equipment required for installation
One loop start analog trunk for connecting a modem
A separate telephone line, if needed, for verbal communication during remote
configuration

Equipment required for mounting

A crosspoint screwdriver if rack mounting or wall mounting the G450
If you will mount the G450 on a flat wall: screws to fasten the G450 to the wall
If you will mount the G450 on a non-flat wall:
- A plywood sheet at least ½ in (1.2 cm) thick and at least 2 x 2 ft (0.6 x 0.6 m) in size
- Wood screws to fasten the G450 to the plywood
- Screws to fasten the plywood board to the wall
Issue 2 June 2008
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents