Chapter 1: Before You Install; Before Going To Site; Preparing Required Equipment; Equipment Required For Installation - Avaya G450 Install Book

Installing and upgrading
Hide thumbs Also See for G450:
Table of Contents

Advertisement

Chapter 1: Before you install

Read this chapter carefully before you begin the installation. If you are installing the G450 at a
customer site, read this chapter before going to the customer site.

Before going to site

Before going to the site, it is necessary to read the planning documentation and prepare

equipment required for installation.

Preparing required equipment

Make sure you have the necessary equipment to assist you in the installation before you start
working.
Equipment required for installation
One loop start analog trunk for connecting a modem
A separate telephone line, if needed, for verbal communication during remote
configuration

Equipment required for mounting

A crosspoint screwdriver if rack mounting or wall mounting the G450
If you will mount the G450 on a flat wall: screws to fasten the G450 to the wall
If you will mount the G450 on a non-flat wall:
- A 48 in. x 48 in. (1.2 m x 1.2 m) plytwood board (US: 3/4 inch plywood), 0.75 in. (20
mm) thick.
- Wood screws to fasten the G450 to the plywood.
- Screws to fasten the plywood board to the wall (pan head at least ¾ in, #10-12 screw)

Equipment required for installing an S8300 Server

One USB CD-ROM drive
Issue 5 November 2009
17

Advertisement

Table of Contents
loading

Table of Contents