Chapter 1: Before You Install; Before Going To The Site; Prepare Required Equipment; Equipment Required For Installation - Avaya G250 Installing And Upgrading

Hide thumbs Also See for G250:
Table of Contents

Advertisement

Chapter 1: Before you install

Read this chapter carefully before you begin the installation. If you are installing the G250 at a
customer site, read this chapter before going to the customer site.
Note:
The G250, G250-DS1, G250-DCP and G250-BRI will be referred to as the G250
Note:
in this Guide and graphics will show the G250 unless there are differences which
affect the documented information.

Before going to the site

Before going to the site, it is necessary to read the planning documentation and prepare

equipment required for installation.

Prepare required equipment

Make sure you have the necessary equipment to assist you in the installation before you start
working.
Equipment required for installation
One loop start analog trunk for connecting a modem
A separate telephone line, if needed, for verbal communication during remote
configuration

Equipment required for mounting

A crosspoint screwdriver if rack mounting or wall mounting the G250
If you will mount the G250 on a wall:
- A 48 in. x 48 in. (1.2 m x 1.2 m) plywood board (US: 3/4 inch plywood), 0.75 in
(20 mm) thick.
- Wood screws to fasten the G250 to plywood.
- Screws to fasten the plywood board to the wall (pan head at least ¾ in, #10-12 screw).
Issue 6 November 2009
17

Advertisement

Table of Contents
loading

Table of Contents