Testing The Integrity Of Data Sent Over The Loop - Avaya G450 Installing And Upgrading

Hide thumbs Also See for G450:
Table of Contents

Advertisement

Testing the integrity of data sent over the loop

Now perform the second part of the test, checking for data errors.
Note:
The loss of signal (LOS) alarm (demand test #138) is not processed during this
Note:
test while the 3-in-24 pattern is active.
1. At the SAT, type clear meas ds1 loop XXXVS to zero out the bit-error counter
where XXX is the administered number of the G450 (for example, 002), and VS is the slot
number on the G450 of the Media Module (for example, V3).
2. Type clear meas ds1 log XXXVS to zero out the performance measurement counter.
3. Type clear meas ds1 esf XXXVS to zero out the ESF error count.
4. Type list meas ds1 sum XXXVS to display the bit error count.
DS1/T1 CPE loopback jack
Issue 2 June 2008
267

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents