Ending An Active Test - Paradyne 8779 User Manual

Tdm sdsl termination units
Table of Contents

Advertisement

8. Testing

Ending an Active Test

Except for the Remote Send Line Loopback, a test initiated by the user can be
ended by the user with the following methods:
T
T
T
An aborted test may continue to run for a few seconds as the Stop command is
sent to the remote end and processed.
8-10
Test Timeout option – Enable the Test Timeout system option so the unit can
automatically terminate tests, and set the Test Duration (min) option to specify
the amount of time that tests can run before the unit terminates the test. The
default is 10 minutes. Refer to
Configuration Options .
Command column – Under the Command column on any test screen,
position the cursor at Stop next to the active test and press Enter to stop a
specific test.
Abort All Tests menu selection – Select Abort All Tests from the Test menu
to stop all tests running on all interfaces. Command Complete appears
when all tests on all interfaces have been terminated. Network-initiated
loopbacks cannot be stopped from the Test menu.
May 2002
Table A-7, System Options,
in Appendix A,
8700-A2-GB20-40

Advertisement

Table of Contents
loading

This manual is also suitable for:

U87778777

Table of Contents