Configuring And Testing Inband Management - Paradyne 8779 User Manual

Tdm sdsl termination units
Table of Contents

Advertisement

Configuring and Testing Inband Management

The Model 8779 Termination Unit allows you to set up remote inband
management using one of the DS0 channels as the management channel to
transport SNMP traffic to the MCP card.
Procedure
To set up inband management for the 8779 unit:
8700-A2-GB20-40
1. Ensure that MCP card is operating with firmware release M04.03.19 or later
and that the 8779 unit is operating with firmware release A02.03.22 or later.
2. Configure the MCP card for inband management using a console session (not
Telnet session). From the MCP card, follow this menu selection sequence:
Main Menu
Configuration
The Ethernet Ports screen appears.
3. Enter Internal for Management Port Type and the slot number of the 8779 unit
to be tested for Management Port Card/Slot #. Then Enter yes to reset the
port and save your changes.
4. Use the Cross Connect Mode screen on the 8779 unit to configure the G.703
port to be used for inband management as a DS0 cross-connection. From the
8779 unit, follow this menu selection sequence:
Main Menu
Configuration
Set Cross Connect Mode
May 2002
Ports
Ethernet Port
Current Configuration
Cross Connect
A. Configuration Options
A-39

Advertisement

Table of Contents
loading

This manual is also suitable for:

U87778777

Table of Contents