Basic commissioning
6.1 Preparing basic commissioning
Factory pre-assignment of the terminal block at the converter with PROFIBUS interface
Figure 6-3
Note
Assignment of terminals following basic commissioning
The converter is assigned in the same way as the converter without PROFIBUS or
PROFINET interface when you deselect bus communication for both the command sources
and the setpoint value specification during basic commissioning of the converter.
54
Default wiring using PROFIBUS or PROFINET communications
SINAMICS G120C frequency converter
Operating Instructions, 03/2012, FW V4.5, A5E02999804B AB