Avaya CS 1000 Fundamentals page 216

Sip dect fundamentals
Hide thumbs Also See for CS 1000:
Table of Contents

Advertisement

Deployment tool
• Use batteries to power the deployment tool.
• Charge the batteries indoors.
Rules for outdoor deployment
Complying with the rules for outdoor deployment
1. Cover outdoor areas before covering indoor areas. Use the deployment tool to
2. Use the deployment handset to determine the outdoor coverage provided by a
3. External housings for outdoor basestations must be mounted directly on walls or
4. If you use the deployment tool outdoors, ensure the deployment tool does not fall
5. If an outdoor critical point cannot be reached, inform the customer.
216
SIP DECT Fundamentals
determine outdoor cell centers.
basestation located indoors.
similar vertical surfaces.
over or come in contact with electrical wires and cables.
Comments? infodev@avaya.com
October 2012

Advertisement

Table of Contents
loading

Table of Contents