Avaya CS 1000 Fundamentals page 211

Sip dect fundamentals
Hide thumbs Also See for CS 1000:
Table of Contents

Advertisement

• c--thumb screw
• d--battery pack
• e--guides
• f--thumb screw nut
• g--power cord
• h--power cord receptacle
• i--tripod
Figure 56: Deployment tool battery details
Assembling the deployment tool
1. Set up the tripod.
2. If required, install the extension arm fitting on the tripod. If not required, go to step
3. If required, secure the extension arm fitting.
4. Mount the extension arm on the tripod.
SIP DECT Fundamentals
Remove the tripod from the carrying case and place it upright. Lock the casters.
4.
Use the Allen key attached to the extender arm to secure the extension arm fitting
Allen screw.
Place the brass end of the extension arm into the fitting, so that the keying hole of
the extension arm mates with the retaining thump screw locking device of the tripod
Prepare the tool for deployment
October 2012
211

Advertisement

Table of Contents
loading

Table of Contents