GE Vivid 3N Pro Series Service Manual page 522

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-8-5-4
Sony UP-21MD Color Video Printer Installation - Procedure1 (cont'd)
22.)Re-install the Connectors Panels Cover as described in
Installation Procedure" on page
23) Reconnect the mains AC power cable from the wall outlet.
24) Turn ON the main circuit breaker located on rear of the Vivid 3N.
25) Turn ON the Vivid 3N by pressing the ON/OFF button on the Control Console.
26.)Select the activation key under System Configuration, VCR/ECG Tab, A/B Swap.
By default, Print B key will be B&W Video printer and Print A key will be Color Video printer. For
more information on switching printer settings, see
8-8-6
Sony UP 21MD Color Video Printer Removal - Procedure 1
NOTE:
This procedure (Procedure 1) is for units that are equipped with a previously-installed B&W printer and a
VCR. The color printer option includes a metal shelf and fastening belt on which the color printer is placed.
1.) Unlock the belt buckles securing the color printer.
2.) Move the color printer sideways, to gain access to the rear panel.
3.) Open the lower middle screw from the color printer's rear panel and remove the Ground cable lug.
4.) Unplug the AC cable.
5.) Unplug the BNC connectors R-G-B and SYNC from the color printer.
6.) Remove the color printer from the top shelf.
Note: Perform the following steps only if the metal shelf must be removed.
7.) Remove the right and left screws located in the legs on either side of the shelf, and remove the shelf.
Note: Do not perform the following step if the metal shelf will later be replaced.
8.) Return and fasten the two screws (removed in
8-152
04
EVISION
Figure 8-140 Belt Buckles Securing Printer
Section 8-8 - Peripherals
8-8.
3-8-9 "VCR/ECG Tab" on page
step
7) to either side of the top cover.
V
3N P
/E
IVID
RO
XPERT
8-2-5-4 "Connector Panels Cover
Belt Buckles
S
M
ERVICE
ANUAL
3-44.

Advertisement

Table of Contents
loading

Table of Contents