GE Vivid 3N Pro Series Service Manual page 489

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-8-1-4
B&W Printer Installation Procedure (cont'd)
2.) Connect the Remote cable, the B/W Video IN cable, and the Power cable, as shown in
102
Remote cable:
From: Left Connectors Panel,
Print Trig
To: REMOTE
3.) Place the B/W printer in its correct final position.
4.) Secure the B/W printer by fastening the belt around it, or together with the VCR (if present).
NOTE:
For shelf installation instructions refer to Color Printer installation in
Installation - Procedure1" on page
5.) Re-install the Connectors Panels Cover as described in
Installation Procedure" on page
6) Reconnect the mains AC power cable from the wall outlet.
7) Turn ON the main circuit breaker located on rear of the Vivid 3N.
8) Turn ON the Vivid 3N by pressing the ON/OFF button on the Control Console.
9.) Select the activation key under System Configuration, VCR/ECG Tab, A/B Swap.
By default, Print B key will be B&W Video printer and Print A key will be Color Video printer. For
more information on switching printer settings, see
04
EVISION
below.
Figure 8-102 B/W Video Printer Connection Cables
Chapter 8 Replacement Procedures
Video IN Cable:
From: Left Connectors Panel,
B/W Video OUT
To: VIDEO IN
8-135.
8-8.
3-8-9 "VCR/ECG Tab" on page
V
3N P
/E
IVID
RO
XPERT
Power cable
From: Right Connectors Panel, AC outlet
To: AC IN
8-8-4-4 "Color Video Printer
8-2-5-4 "Connector Panels Cover
S
M
ERVICE
ANUAL
Figure 8-
3-44.
8-119

Advertisement

Table of Contents
loading

Table of Contents