Validating Communication with the DICOM Server (cont'd)
5) If the connection was successfully established, trackball to the Dicom Storage Server line and
press Select, then trackball to the Check button and press Select.
The properties of the DICOM storage server configuration are displayed on the right side of the tab,
for reference.
6.) If the connection was successfully established, trackball to the Dicom Print line and press Select,
then trackball to the Check button and press Select.
-
-
7) If both connections were established, click OK to exit the configuration procedure. If not, review the
entire procedure to locate the error.
04
EVISION
If the connection is established, a green checkmark is displayed.
If the connection cannot be established, a red cross is displayed.
If the connection is established, a green checkmark is displayed.
If the connection cannot be established, a red cross is displayed.