GE Vivid 3N Pro Series Service Manual page 472

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-6-6-5
Up/Down Handle Replacement Procedure
NOTE:
This describes the procedure for installing the new-type (metal) Up/Down Handle.
1) Insert the M6 Axis screw through the screw hole in the first handle mounting bracket, through the
two holes in the new metal Up/Down handle, then through the screw hole in the second bracket and
into M6 nut, as shown in
Handle Mounting Bracket
M6 Axis Screw
Figure 8-85 Fixing the Up/Down Handle to the Handle Mounting Brackets
2.) Tighten the M6 nut fully to secure the handle mounting brackets to the handle assembly.
3.) Insert the end of the gas spring cable through the slot on the gas spring cable retaining bracket and
into the grooved hole on the Up/Down handle. Slide the end of the cable into the groove, carefully
aligning the groove on the cable with that of the groove in the hole (see
Tighten the securing nut against the gas spring cable retaining bracket, to hold the cable securely
in position.
8-102
04
EVISION
Figure 8-85
Handle Mounting Bracket
Section 8-6 - Lower Section Components Replacement
V
IVID
below.
3N P
/E
S
RO
XPERT
ERVICE
M6 Nut
Up/Down Handle
Figure 8-86
below).
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents