GE Vivid 3N Pro Series Service Manual page 389

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
8-2-10-4
Control Console Bottom Cover (Upper Section) Installation Procedure
1) Raise the control console to its maximum height.
2) Return the bottom cover to its original position at the rear of the machine.
3) Fasten the bottom cover with its six screws, three on either side.
4) Fasten the bottom metal cover in its original position with its four screws.
5) Tighten the two fastening screws of the AC/VGA connectors box. These screws can be accessed
from the opened space at the back of the gas spring, using a long screw driver.
6) Return the white painted metal shelf to its original position inside the compartment located on the
left side of the control console and fasten it at its base with its two screws.
7) Lift the front section of the gas spring cover from the top cover collar and fasten it with its three
8) Return the rear section of the gas spring cover to its original position and fasten it with its two
screws.
9) Plug the AC cable and VGA cable in to the rear of the control console, as shown in
10) Return all peripherals to their original positions.
04
Chapter 8 Replacement Procedures
V
RO
XPERT
8-12.
8-17.
ERVICE
ANUAL
Figure 8-18 "AC
8-19

Advertisement

Table of Contents
loading

Table of Contents