GE Vivid 3N Pro Series Service Manual page 456

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-5-12-6
BEP2 - ECG Module Installation Procedure
NOTE:
BEP2 refers to a Pentium 4-based BEP (newer type).
1.) Slide the new ECG Module into the front of the BEP, pushing it in until it aligns with other modules
at the front of BEP.
2) Secure the ECG Module with four screws, two from each side of the BEP (see
Module Removal- BEP2" on page
3.) Replace the BEP Front Panel and secure it with the two screws previously removed.
4) Reconnect the power cable and the COM 2 cable to the rear of the new ECG Module.
5) Install the BEP left and right side covers, as described in
Procedure" on page
6.) Carefully return the BEP to its original location and secure all brackets by tightening the screws.
7) Reconnect all cables at the rear of the BEP.
8) Return the Vivid 3N rear cover to its original position - see
Procedures" on page
9) Return the Vivid 3N side covers, as described in
8-4.
10) Reconnect the mains AC power cable from the wall outlet.
11) Turn ON the main circuit breaker located on rear of the Vivid 3N.
12) Turn ON the Vivid 3N by pressing the ON/OFF button on the Control Console.
8-86
04
EVISION
Figure 8-73 ECG Module inside BEP2
8-64.
8-7.
Section 8-5 - Back End Parts Replacement
8-85).
8-5-3-4 "BEP2 - Side Cover Installation
8-2-2-4 "Side Covers Installation Procedure" on page
V
3N P
/E
S
IVID
RO
XPERT
ERVICE
Figure 8-72 "ECG
8-2-4 "Rear Cover Replacement
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents