GE Vivid 3N Pro Series Service Manual page 422

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-4-5-3
Front End Crate Removal Procedure (cont'd)
10) Disconnect the two Ground cables from the crate - see
on page
11) Carefully remove the front end crate.
CAUTION: To avoid damaging the Ground cables, pull the crate out very slowly.
8-4-5-4
Front End Crate Installation Procedure
1) Return the front end crate, but do not slide it to its final position.
2) Reconnect the two Ground cables to their original position on the front end crate.
3) Reconnect the front end fan power cable, located on the upper part of the outside wall of the
front end crate.
4) Gently slide the front end crate back to its original position.
5) Fasten the front end crate to the frame with the eight screws.
6) Reconnect the PCI cable to the Image Port Board and slide it back to its original slot in the crate.
7) Mount the PCI flat cable under the spring clamp, and then tighten the two winding nuts to secure
the cable to the right wall of the crate.
8) Reconnect the AC power cable to the DC power supply.
9) Return the front door of the crate and tighten the two screws that secure the door in place.
10) Return the left side cover to its original position, as described in
Procedure" on page
11) Ensure that the filter is clean, and then return it to its original position.
Note: Refer to
12) Reconnect the probes.
8-52
04
EVISION
8-51.
Figure 8-49 Front End Crate
8-4.
Chapter 10 - Periodic Maintenance
Section 8-4 - Front End Parts Replacement
V
3N P
IVID
Figure 8-48 "Fan Power Cable Connections"
8-2-2-4 "Side Covers Installation
for filter cleaning procedures.
/E
S
M
RO
XPERT
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents