GE Vivid 3N Pro Series Service Manual page 463

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-6-1-4
AC Distribution Box Installation Procedure
1) Insert the AC Distribution Box through the rear of the machine and then push it into its original
position.
2) Fasten the AC Distribution Box using the two screws located in the lower bracket of the AC
Distribution Box.
3) Tighten the screw that connects the Ground cable to the AC Distribution Box.
4) Plug in all the internal cables to the AC Distribution Box, including the voltage setting plugs at
Jumper1 and Jumper2.
5) Install the rear, left and right covers, as described in
page 8-7
04
EVISION
and the
8-2-2-4 "Side Covers Installation Procedure" on page
Chapter 8 Replacement Procedures
V
3N P
/E
IVID
RO
XPERT
8-2-4-4 "Rear Cover Installation Procedure" on
8-4.
S
M
ERVICE
ANUAL
8-93

Advertisement

Table of Contents
loading

Table of Contents