GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
8-3-2-5
Installing a New VIC Correlation Box (cont'd)
8.) Fasten the VIC assembly to the metal frame, using the two screws removed in
9.) Fasten the upper back-end BEP bracket in position, using the two screws removed in
10.)Reassemble the side covers - see
11.)Check that all covers are fixed firmly in position.
For the next stage of the new monitor installation procedure, proceed to the instructions for
Quality Calibration for the Vivid 3N 17" Monitor" on page
8-34
04
EVISION
Figure 8-35 VIC Correlation Module in Position
Section 8-3 - Control Console Components Replacement
8-2-2-4 "Side Covers Installation Procedure" on page 8-4
6-20.
V
3N P
/E
S
IVID
RO
XPERT
ERVICE
step
M
ANUAL
3.
step
2.
6-7-2 "Image