Mx10008 Site Preparation Overview; Mx10008 Site Preparation Checklist - Juniper MX10008 Hardware Manual

Universal routing platform
Table of Contents

Advertisement

MX10008 Site Preparation Overview

IN THIS SECTION

MX10008 Site Preparation Checklist | 91

MX10008 Environmental Requirements and Specifications | 92
General Site Guidelines | 94
Site Electrical Wiring Guidelines | 94
MX10008 Rack Requirements | 96
MX10008 Clearance Requirements for Airflow and Hardware Maintenance | 98
MX10008 Site Preparation Checklist
The checklist in
Table 27 on page 91
an MX10008 installation.
Table 27: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and the router installation
site.
Calculate the power consumption and
requirements.
summarizes the tasks you need to perform when preparing a site for
For More Information
"MX10008 Environmental
Requirements and Specifications"
on page 92
JNP10K-PWR-AC Power
Specifications on page 105
JNP10K-PWR-DC Power
Specifications on page 115
Power Requirements for MX10008
Components
Performed By
Date
91

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents