Alcatel-Lucent 1665 Installation Manual page 366

Data multiplexer (dmx)
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Installation checklist
............................................................................................................................................................................................................................................................
Section and Chapter
Chapter 5, "Operational
tests"
............................................................................................................................................................................................................................................................
E - 6
Procedure
Ethernet port wiring verification testing (p.
4-38)
OC-3 (LNW37, LNW45, LNW55)/OC-12
(LNW49, LNW55)/OC-48 (LNW55, LNW62)
low-speed SFP test procedure (p. 4-42)
OC-3/OC-12/OC-48 SFP low-speed SFP test
procedure (p. 4-42)
OC-3 (low-speed) testing (p. 4-44)
OC-3 testing procedure (p. 4-44)
OC-12 (low-speed) testing (p. 4-48)
OC-12 testing procedure (p. 4-48)
OC-12 facility loopback testing (p. 4-50)
OC-48 (low-speed) testing (p. 4-53)
OC-48 low-speed testing procedure (p. 4-53)
OC-48 facility loopback testing (p. 4-54)
LED test (p. 4-57)
LED test procedure (p. 4-57)
Additional optical tests (optional) (p. 4-58)
Low-speed optical testing (p. 4-58)
Office alarm test (p. 5-4)
Office alarm test procedure (p. 5-5)
Automatic protection switching and alarm test
(p. 5-9)
Main OLIU switching test (p. 5-9)
Manual switching tests (p. 5-12)
Main OLIU switching test (p. 5-12)
External timing verification (p. 5-14)
Timing verification test procedure (p. 5-14)
Completed
Required
Yes
No
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
365-372-304R7.1
Issue 2 March 2008

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents