OC-3/12/48 Ring setup and testing: integration
procedures
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
19
Select Port AID: dcc-m1-1, OSI Over DCC: enabled, LAPD Role: user-side.
........................................................................................................................................................................................................................
20
Select Port AID: dcc-m2-1, OSI Over DCC: enabled, LAPD Role: network-side.
........................................................................................................................................................................................................................
21
Set the timing to internal (free running) at LT-DMX-1 and line time LT-DMX-2.
Configuration -> Timing/Sync... Timing Mode: Free Running.
........................................................................................................................................................................................................................
22
Verify proper communications with the adjacent Alcatel-Lucent 1665 DMX nodes.
Administration->OSI Neighbor Map.
Result:
........................................................................................................................................................................................................................
23
Perform steps in this procedure on all adjacent nodes in the ring.
........................................................................................................................................................................................................................
24
After all connections and tests have been made, verify optical fiber cables are placed in
fiber tray and properly routed in bay framework.
........................................................................................................................................................................................................................
25
Reconnect the office alarm cable disconnected in
........................................................................................................................................................................................................................
26
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
6 - 1 0
The adjacent node appears in the neighbor list.
S
F
T E P S
Step
1.
Appendix E, "Installation
Fiber installation
checklist".