Installation tests
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
6
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
DS3 function unit protection switching test (command)
While an STS cross-connection exists, and a test set is connected, the protection switching
will be verified.
This test will initiate switching commands from the CIT and verify proper switching and
LED indications while monitoring transmission at a test set.
Note:
this procedure should be performed on each Function unit Slot pair.
........................................................................................................................................................................................................................
1
Select Fault -> Protection Switch...
........................................................................................................................................................................................................................
2
Click on 1+1 Equip fn-x (x is a,b,c or d corresponding to the function group equipped
with DS3).
........................................................................................................................................................................................................................
3
Click Select.
........................................................................................................................................................................................................................
4
In the Switch Type: pull-down, select Manual (Normal).
........................................................................................................................................................................................................................
5
Click Apply.
Result:
was standby is now active. Transmission should take a momentary hit as it is switched
to the other pack. This information should agree with the ACTIVE LEDs on the
LNW16/LNW19/LNW19B, LNW18 or LNW20 circuit packs.
........................................................................................................................................................................................................................
6
Repeat
pack, with the same results as the previous step.
............................................................................................................................................................................................................................................................
4 - 3 0
S
F
T E P S
It is not necessary to perform this test on each sts cross-connection, however
The pack that was active should now be the standby pack and the pack that
Step 1
through
Step 5
Appendix E, "Installation
to verify a switch back to the original Function unit circuit
DS3 protection switching
checklist".