Alcatel-Lucent 1665 Installation Manual page 365

Data multiplexer (dmx)
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Installation checklist
............................................................................................................................................................................................................................................................
Section and Chapter
............................................................................................................................................................................................................................................................
365-372-304R7.1
Issue 2 March 2008
Procedure
DS1 non-terminating equipment transmission
testing (optical main OLIU) (p. 4-12)
DS1 protection switching (p. 4-15)
DS1 function unit protection switching test
(manual) (p. 4-15)
DS1 function unit protection switching test
(command) (p. 4-16)
DS1 path switching test (manual) (p. 4-17)
DS1 cleanup procedures (p. 4-19)
Delete any existing DS1 cross-connections (p.
4-19)
Verify cross-connects removed (p. 4-22)
DS3/EC1 and TMUX testing procedure (p. 4-23)
Verify provisioning (p. 4-23)
DS3 terminating equipment loopback testing
(optical main OLIUs) (p. 4-24)
DS3 non-terminating transmission (optical
main OLIU) (p. 4-27)
DS3 protection switching (p. 4-29)
DS3 function unit protection switching test
(manual) (p. 4-29)
DS3 function unit protection switching test
(command) (p. 4-30)
DS3 path switching test (command) (p. 4-31)
DS3 cleanup procedures (p. 4-33)
Delete the existing DS3 cross-connections (p.
4-33)
LNW66, LNW71 and LNW74 (10/100T) TX
ethernet cabling testing (p. 4-37)
Ethernet port assignment verification testing (p.
4-37)
Completed
Required
Yes
No
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
E - 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents