Alcatel-Lucent 1665 Installation Manual page 209

Data multiplexer (dmx)
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Installation tests
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
7
Once the loopback is up, a test signal shall be generated at the DS3 terminating equipment
which will verify that the cabling is correct.
........................................................................................................................................................................................................................
8
While observing the error-free transmission, grasp the DS3 cable about two inches from
the BNC connector head and gently rotate (twist) the cable in a clockwise and counter
clockwise direction about 45 degrees (gently).
Result:
connector must be cut off and replaced.
If an error-free signal is not received:
Check the LBOs settings using
LBOs (p.
Verify that the pack is provisioned for the framing format being sent from the test set,
CBIT or M13.
Verify that the port is provisioned for DS3. See
Check the DS3/EC1 cabling for proper connections.
........................................................................................................................................................................................................................
9
Once the test is complete, remove the loopback.
Select Fault -> Analysis -> Loopback...
........................................................................................................................................................................................................................
10
Choose the DS3 port to test and click Select.
........................................................................................................................................................................................................................
11
Select Release and Loopback Type: Facility and click Apply.
........................................................................................................................................................................................................................
12
Check off the appropriate box in
.
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
365-372-304R7.1
Issue 2 March 2008
If any errors are detected while performing this "wiggle test," the BNC
4-6).
S
F
T E P S
View -> Equipment
Verify provisioning (p.
Appendix E, "Installation
DS3/EC1 and TMUX testing procedure
(see
Setting DS3/EC1 and TMUX
4-23).
checklist".
4 - 2 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents