Installation tests
............................................................................................................................................................................................................................................................
Verify that the pack is provisioned for the framing format being sent from the test set,
•
CBIT or M13.
Verify that the port is provisioned for DS3. See
•
Check the DS3/EC1 cabling for proper connections.
•
........................................................................................................................................................................................................................
6
Once the test is complete, remove the loopback.
Select Fault -> Analysis -> Loopback...
........................................................................................................................................................................................................................
7
Choose the DS3 port to test and click Select.
........................................................................................................................................................................................................................
8
Select Release and Loopback Type: Facility and click Apply.
........................................................................................................................................................................................................................
9
Repeat
........................................................................................................................................................................................................................
10
Check off the appropriate box in
.
E
O
N D
........................................................................................................................................................
DS3 non-terminating transmission (optical main OLIU)
Perform the remaining steps in this procedure for all Function Groups equipped with
LNW16 (12DS3/EC1), LNW19/LNW19B (48DS3/EC1), LNW18 (TMUX) or LNW20
(48TMUX) circuit packs that are terminated at a DSX3 patch panel.
........................................................................................................................................................................................................................
1
Select Configuration -> Cross-Connections...
........................................................................................................................................................................................................................
2
Use the Cross-Connection Wizard to enter a new cross-connection at the STS1 rate,
UPSR Ring Add/Drop, between m-1-1 and fn-1 (fn will be a,b,c or d depending on the
slot where the DS3 or TMUX CP is located).
........................................................................................................................................................................................................................
3
Set the DS3 test set to transmit and receive a framed Pseudo Random Bit Stream (PRBS)
DS3 test signal M13.
M13 should be used to test TMUX.
............................................................................................................................................................................................................................................................
365-372-304R7.1
Issue 2 March 2008
Step 1
through
Step 8
S
F
T E P S
Verify provisioning (p.
for each DS3 cabled to the DSX-3.
Appendix E, "Installation
DS3/EC1 and TMUX testing procedure
4-23).
checklist".
4 - 2 7