jcb 214e Service Manual page 748

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section F
113 - 2
Reverser Unit - Dismantling (cont'd)
8
Remove the clutch friction/counter plates. Keep them
together in sets, DO NOT mix the plates with those from
other clutches.
9
Remove last counter plate.
10
Remove disc spring.
*
11
Position clutch assembly in press to compress piston
spring then remove circlip.
12
Lift off spring retaining plate.
13
Remove spring and oil baffle.
*
14
Knock the clutch shaft on a piece of aluminimum (or
wood) to remove the piston.
Note: If the piston does not loosen when the clutch shaft is
knocked on aluminimum, then hand pump air down the shaft
oil inlet hole.
15
Remove and discard piston and shaft 'O' rings.
*
16
Repeat steps 2 to 15 to dismantle the opposite clutch.
*
Note that a spacer is not fitted on the opposite
(Forward) clutch. Refer to step 4.
9803/3280
Transmission
Synchro Shuttle Gearbox
Purchased from www.WorkshopManuals.co.uk
8
9
10
11
12
13
S145000
S407190
15
Section F
113 - 2
S232741
S145010
S407200
Issue 2*

Advertisement

Table of Contents
loading

This manual is also suitable for:

4cx3cx214215217

Table of Contents