Front Axle Dismantling And Assembly (2 Wheel Drive Machines) - jcb 214e Service Manual

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section F
86 - 1
Dismantling and Assembly
(2 Wheel Drive Machines)
When Dismantling
The numerical sequence shown on the illustration is
intended as a guide to dismantling.
For assembly the sequence should be reversed.
A suitable press will be required to remove and replace stub
axle 22.
When Assembling
Fit bushes 18 and 20 with open ends of grease grooves
facing the axle beam.
Add shims 16 as required to give zero to 0.1mm (0.004in)
clearance between axle beam and bearing 15.
Apply JCB Lock and Seal to threads of bolt 9.
Pack JCB Special MPL Grease into hubs 5 and between lips
of seals 7.
9803/3280
Transmission
Purchased from www.WorkshopManuals.co.uk
Front Axle
Bed in bearings 6 and 8 by rotating hub in each direction
whilst tightening nut 3. When correct torque setting has
been achieved, back off one flat and fit split pin 2.
Torque Settings
Item
Nm
kgf m
3
40†
4.0†
9
30
3.0
† Back off one flat before fitting split pin.
Section F
lbf ft
30†
21
86 - 1
S258280
Issue 1