Synchro Shuttle Gearbox Dismantling - jcb 214e Service Manual

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section F
110 - 1
Dismantling
Cleanliness is of the utmost importance when servicing the
gearbox. All precautions to prevent any ingress of dirt, grit
etc. must be taken. To this end wash the exterior of the
gearbox assembly as follows;
Make sure that all open ports and orifices are effectively
plugged. Remove any deposits of dirt, grit and oil from the
outer casings using a suitable degreaser and water. Dry the
casings.
Note: For details of service tools refered to, see Service
Tools at the front of this section.
Note: If the main hydraulic pump has not been removed,
remove it. Support the pump, undo the 2 fixing bolts A and
then withdraw the pump from the gearbox.
1
Remove t he c irc lip and t hen w it hd raw t he p ump
driveshaft 1a together with its bearing 1b.
2
Remove and discard the shaft sealing ring.
9803/3280
Transmission
Synchro Shuttle Gearbox
Purchased from www.WorkshopManuals.co.uk
A
A
1a
2
1b
1
Section F
110 - 1
A388030
A388040
Issue 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

4cx3cx214215217

Table of Contents