Hydraulics: Smooth Ride System; Accumulator Removal And Replacement - jcb 214e Service Manual

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section E
96 - 1
Accumulator
Removal and Replacement
Removal
1
Park the machine on level ground, lower the loader
arms, switch off the engine and chock all four wheels.
Release all hydraulic pressure in the accumulator by
selecting the SRS ON and operating the loader arm
hydraulic lever.
! DANGER
Before disconnecting or dismantling the accumulator
discharge all gas pressure. Failure to comply can cause
rapid discharge of gas and/or hydraulic fluid which can
result in death, personal injury and damage to the
machine.
Hyd 2-5
2
Discharge
the
accumulator,
Procedures,
Smooth
Charging/Discharging the Accumulator.
3
Disconnect hydraulic hose A and plug.
4
Loosen both 'U' clamps B and slide the accumulator
towards the front of the machine. When clear of the 'U'
clamps carefully lower and withdraw accumulator.
B
9803/3280
Hydraulics
Smooth Ride System
refer
to
Service
Ride
System
Purchased from www.WorkshopManuals.co.uk
Replacement
Replacement is a reverse of removal.
1
Charge the accumulator, refer to Service Procedures,
Smooth Ride System - Charging/ Discharging the
Accumulator.
2
Operate the machines hydraulic system. Check for
correct operation and leaks.
3
Replenish the hydraulic system with the recommended
hydraulic fluid as required, refer to Section 3 Fluids,
Lubricants, Capacities and Specifications.
-
Section E
96 - 1
A
B
S308290
Issue 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

4cx3cx214215217

Table of Contents