jcb 214e Service Manual page 188

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section C
23 - 2
Wiring Harness - Repair Procedure (cont'd)
With the Butane Heater assembly 892/00350, seal the
connection using the following procedure.
Remove the cap A from the end of the disposable gas
a
cartridge B.
b
Before assembling the gas cartridge to the reflector
element C, turn the red ring D to the left, (in the
direction of the minus sign marked on the ring).
c
Position the tube hanging down from inside the reflector
assembly into the hole at the top of the gas cartridge.
Then press the gas cartridge up into the reflector
assembly as far as possible until the two elements are
clasped firmly together. A click will be heard.
d
Turn the small ring E so that the air holes at F are
completely closed.
9803/3280
Service Procedures
Purchased from www.WorkshopManuals.co.uk
Electrics
S189490/1
S189490/2
S189490/3
S189490/4
Section C
A
B
C
D
F
E
23 - 2
Issue 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

4cx3cx214215217

Table of Contents