jcb 214e Service Manual page 738

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section F
112 - 6
Assembly (cont'd)
15
Smear mainshaft output end bearing with JCB HP
Grease and place mainshaft L in position, followed by
the forward/reverse assembly M.
16
Fit idler gear spacer.
17
Fit thrust washers and bearing assembly. Lubricate and
*
fit the needle roller bearing 17a.
18
Fit synchro cone to 3rd gear (mainshaft L). Fit the idler
gear 18a to the spindle whilst tilting mainshaft L to one
side.
19
Fit thrust washers and bearing assembly.
*
20
Smear front end bearing of layshaft with JCB HP
Grease, and carefully lower layshaft into position.
21
If re-using synchro assembly fit the parts in their original
positions.
22
Using a suitable wire support locate interlock plunger
into its bore. A smear of grease will hold the plunger in
position. If required, access is available via a
side drilling.
9803/3280
Transmission
Synchro Shuttle Gearbox
1
/
4
Purchased from www.WorkshopManuals.co.uk
18
L
20
BSP
19
18a
17a
17
16
Section F
112 - 6
M
S407370
21a
21
22
221090
Issue 2*

Advertisement

Table of Contents
loading

This manual is also suitable for:

4cx3cx214215217

Table of Contents