jcb 214e Service Manual page 121

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section B
21 - 6
Direct Glazing (cont'd)
Installing the New Glass (cont'd)
Make the inside seal smooth:
3
a Wearing surgical gloves, dip your finger in a soapy
water solution.
b
Use your finger to make the inside seal smooth.
4
All exposed edges must be sealed using Black
Polyurethane Sealant (see Sealing and Retaining
Compounds).
5
Clean the glass after installation:
IMPORTANT: Use extreme caution when wiping the inside
of the new glass - pushing too hard on the inside of the
glass will affect the integrity of the bonded seal.
a Small amounts of sealant can be cleaned from the
glass using the 'Active Wipe 205'.
b Large amounts of excess sealant should be left to
' cure' (see Note 4) and then cut off with a sharp
knife.
Note 4: On completion of the glass replacement procedures,
the sealant 'curing' time is 30 minutes. This means that the
machine can be driven and used after 30 minutes, but it
MUST NOT be used during the curing period of 30 minutes.
c
Clean the glass using a purpose made glass
cleaner.
6
On completion of the glass installation procedures tidy
the work area:
a Remove ALL broken glass from the cab area.
b Remove the protective covers from the cab seat and
control pedestals.
c Renew all 'warning' and 'information' decals so that
the new installation conforms with the original cab
installation.
9803/3280
Body & Framework
Service Procedures
Purchased from www.WorkshopManuals.co.uk
Section B
21 - 6
Issue 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

4cx3cx214215217

Table of Contents