Auxiliary Relief Valves Dismantling And Assembly - jcb 214e Service Manual

Backhoe loader
Hide thumbs Also See for 214e:
Table of Contents

Advertisement

www.WorkshopManuals.co.uk
Section E
61 - 4
Dismantling and Assembly
Auxiliary Relief Valves
Eight A.R.V's are fitted at positions 4H to 4Q. These are
identical in design but have various pressure settings, refer
to Technical Data.
Note: Valve 4Q is only fitted to machines equipped with a
Powerbreaker.
The numerical sequence shown on the illustration is intended
as a guide to dismantling.
For assembly the sequence should be reversed.
Dismantling
Dismantle sub-assembly 14 from item 1 using a special tool
(see Service Tools). The special spanner locates in cross
holes B.
Dismantle sub-assembly 14 into its component parts.
Make sure that small drilling A is not blocked.
Discard old and worn O-rings and back-up rings.
Assembly
Renew all O-rings and back-up rings.
Lubricate O-rings and back-up rings with JCB Hydraulic
Fluid.
Fit back-up ring 13 on the upper side of 'O' ring 12 as shown
in the inset.
Fit flat face of sleeve 9 against shoulder of poppet 10.
Torque tighten item 14 using the special tool (see Service
Tools), until its shoulder seats firmly against item 1.
Pressure test the relief valves, refer to Service Procedures,
Excavator Valve - Pressure Testing.
Torque Settings
Item
Nm
kgf m
1
65
6.6
48
3
24
2.5
18
9803/3280
Excavator Valve
lbf ft
Purchased from www.WorkshopManuals.co.uk
Hydraulics
A.R.V. Position Key
Slew Right
Slew Left
Boom Rod
Boom Head
Dipper Rod
Dipper Head
Bucket Rod
Bucket Head
Note: The bucket rod side A.R.V. is only fitted to machines
equipped with a Powerbreaker.
Section E
Control Layout
JCB
ISO
Case
4H
4H
4H
4J
4J
4J
4K
4M
4M
4L
4N
4N
4N
4L
4K
4M
4K
4L
4Q
4Q
4Q
4P
4P
4P
61 - 4
Ford
4H
4J
4K
4L
4N
4M
4P
4Q
Issue 2*

Advertisement

Table of Contents
loading

This manual is also suitable for:

4cx3cx214215217