Setting Up The System; Overview; Setup Flow - NEC Express5800 120Rj-2 User Manual

Hide thumbs Also See for Express5800 120Rj-2:
Table of Contents

Advertisement

User Guide

Setting Up the System

Overview

This chapter describes how to select a site, unpack the system, make cable connections,
and power on the system units. Information on front and rear panel features, switches
and LEDs are also included in this chapter.

Setup Flow

Follow the flowchart below to set up the server.
Select a suitable site for the server. Assemble the 19-inch rack assembly.
Unpack the server and accessories from the chipping carton box.
Install the server into the rack assembly.
Connect peripheral devices to the server.
Connect the power cord to the server.
Power on the server to start software setups. Setups depend on the optional internal devices installed and
the peripheral devices connected.
Install an operating system to the server. .
Install the utilities in the provided NEC ExpressBuilder DVD-ROM..
Connecting peripheral devices
Connecting the power cord
Installing the operating system
34
www.nec-computers.com
Selecting the server site
Unpacking the system
Installing the server
Turning on the server
Installing the utilities

Advertisement

Table of Contents
loading

Table of Contents