NEC Express5800 120Rj-2 User Manual page 76

Hide thumbs Also See for Express5800 120Rj-2:
Table of Contents

Advertisement

User Guide
Feature
Thermal Sensor
BMC IRQ
POST Error Pause
AC-LINK
Power On Delay
Time (Sec)
Platform Event
Filtering
To power on the server from the UPS (Uninterruptible Power
Supply), select [Server] - [AC LINK] - [Power On].
The table below shows the operation when the AC power to the server is turn off once
and then on again, depending on the setting of "AC LINK."
System status before AC power off
Operating
Aborting (DC power being off also)
Forced shutdown
Table 15: Server Menu (Continued)
Choices or
Description
Display Only
Disabled
Specifies whether the thermal
sensor monitoring function is
Enabled
enabled or not.
If a thermal error is detected
while this parameter is enabled,
the system stops at the end of
the POST.
Disabled
Determines the routing of the
BMC Interrupt.
IRQ 11
Disabled
Specifies whether the system
Enabled
waits for user intervention on
critical POST errors.
If no keyboard is connected to
the system, this option is
ignored and the system always
continues to bootup.
Stays Off
Sets the AC-LINK feature.
Last State
Determines the mode of
Power On
operation if a power loss
occurs.
20 - 255
Sets the power-on delay time
whithin a 0 to 255 seconds
range.
This parameter is valid when
"Power On " or "Last State" is
specified for AC Link.
Disabled
This item is meaningless when
Enabled
the notification feature of the
Remote Management Card is
enabled.
Caution
Setting of AC LINK
Stay Off
Last State
Off
On
Off
Off
Off
Off
76
www.nec-computers.com
Your Setting
Power On
On
On
On

Advertisement

Table of Contents
loading

Table of Contents