Back Side - MOTO GUZZI Stelvio 1200 NTX ABS Service Station Manual

Hide thumbs Also See for Stelvio 1200 NTX ABS:
Table of Contents

Advertisement

Electrical system
The connection must be between the
chassis and the air filter.
TABLE D - LAMBDA PROBE SYSTEM CLAMP-
ING
Clamp the stand system with the return
pipes in sump and leave the lambda
probe system free
The ground lead must be towards the
bottom, tighten the stud bolt nut to
10Nm (7.37 lbf ft).
TABLE E - BATTERY COMPARTMENT HOUS-
ING
The battery housing must be free of
any connections or pipes, in order to
allow perfect fitting.

Back side

CAUTION
ONCE THE ELECTRICAL SYSTEM IS REFITTED, THE CONNECTORS RECONNECTED AND
CLAMPS AND RETAINERS RESTORED, CARRY OUT THE CHECKS INDICATED UNDER "SPE-
Revente Interdite - Revendita Vietata - Resaling Forbiden - Wiederverkauf Verboten
ELE SYS - 48
Stelvio 1200 NTX ABS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents