Rack-Mount Setup

The rail kit can be mounted in 48-cm (19-inch) panel racks from 61 to
76 cm (24 to 30 inches) deep.
NOTE Mounting rails are required for each individual cabinet and are located in the UPS
and EBM cartons. The UPS requires 5U and each EBM requires 3U of rack height. All
hardware is supplied.
NOTE The UPS and any optional cabinets MUST be installed at the bottom of the rack. If
placed in a rack with existing equipment, the rack must be reconfigured to allow the UPS
installation at the bottom of the rack.
Each rail kit requires one (1) of each item in the following list:
S
Left adjustable rail assembly (located in the UPS and EBM cartons)
S
Right adjustable rail assembly (located in the UPS and EBM cartons)
S
Rail hardware kit (located in the E64 UPS and EBM accessory kits)
To install the rail kit(s):
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 1).
Front
Rail Assembly
2.
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
Place the first rail at the bottom, using positions 1 and 6 for the
front pan-head screws. If you are installing additional rails, place the
next rail 4 holes above the last installed screw (see Figure 2).
®
EATON Powerware
9125 (9910-E64) UPS Installation Guide for IBM
Assembly Wing Nuts
Figure 1. Adjusting the Rail Depth
®