Post Assembly - Toyota 1HD-FT Repair Manual

Table of Contents

Advertisement

:EG
EG·88
ENGINE - ENGINE MECHANICAL
--.
POST ASSEMBLY
1.
INSTALL ENGINE MOUNTING 8RACKETS
Torque: 68.6 N·m (700 kgf·cm. 51 tt.lbf)
2.
INSTALL TURBO OIL HOSE
3.
INSTALL OIL PRESSURE SENDER GAUGE
(See oil pressure check in Lubrication System)
4.
INSTALL OIL COOLER ASSEMBLY. OIL DIPSTICK
AND GUIDE
(See oil cooler installation in Lubrication System)
5.
INSTALL OIL STRAINER. TIMING GEAR CASE (OIL
PUMP) AND OIL PAN
(See oil pump installation in Lubrication System)
6.
INSTALL INJECTION PUMP STAY
Torque: 69 N·m (700 kg'·cm. 51 ft-lbf)
7.
INSTALL NO.1 CYLINDER BLOCK INSULATOR
8.
INSTALL INJECTION PUMP
(S.e injection pump Installation in Fuel System)
9.
INSTALL ALTERNATOR AND BRACKET
ASSEMBLY
Torque: 68.6 N·m (700 kgf·cm. 51 ft-Ib'l
10. INSTALL WATER INLET AND THERMOSTAT
(See thermostat installation in Cooling System)
11. INSTALL WATER PUMP. TURBO WATER PIPE AND
ALTERNATOR ADJUSTING BAR
(See water pump installation in Cooling System)
12. INSTALL TIMING GEARS
(See timing gears installation)
13. INSTALL CYLINDER HEAD
(See cylinder head installation)
14. INSTALL TIMING BELT AND PULLEYS
(See timing belt installation)
15. DiSCONNECT ENGINE FROM ENGINE STAND
16. INSTALL REAR END PLATE
Install the rear end plate with the bolt.
Torque: 18.1 N·m (185 kgf·cm. 13 tt·lbf)
17. MIT:
INSTALL FLYWHEEL
(a)
Install the flywheel on the crankshaft.
(b)
Install and uniformly tighten the bolts in several
passes. in the sequence shown.
Torque: 127.4 N·m (1.300 kgf·cm. 94 ft.lbf)
18. A/T:
INSTALL FLYWHEEL. DRIVE PLATE AND REAR
PLATE (See procedure step 17)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents