Toyota 1HD-FT Repair Manual page 115

Table of Contents

Advertisement

EG-'02
ENGINE - TURBOCHARGER SYSTEM
EG
1.
INSTALL NO.1 TURBO WATER PIPE
Install a new gasket and the water pipe with the 2
nuts.
Torque: 7.8 N·m (80 kgt-em. 69 In..lbf)
2.
INSTALL TURBOCHARGER TO EXHAUST
MANIFOLDS
Install a new gasket and the turbocharger to the
exhaust manifolds with the 4 nuts.
Torque: 52 N·m (530 kg'.em, 38 ft.lb')
3.
INSTALL TURBO OIL PIPE
Install a new gasket and the oil pipe with the 2 nuts.
Torque: 18.1 N·m (185 kg'·cm. 13 't·lb')
4.
INSTALL TURBOCHARGER AND EXHAUST
MANIFOLDS ASSEMBLY
(a)
Install 2 new gasket to the cylinder head.
(b)
Install the turbocharger and exhaust manifolds as-
sembly with the 12 nuts.
Torque: .'.7 N·m (425 kgf·cm. 31 ft·lb')
(d)
.)
~
(e)
0'
5.
U
Install 2 new gaskets and the union bolt of the turbo
oil pipe.
Torque: 24.5 N·m (250 kgt-em. 18 f1-lbf)
Connect the turbo oil hose to the cylinder block.
INSTALL TURBOCHARGER STAY
Torque: 117.7 N·m (1200 kgt'em, 87 ft·lb')

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents